RCT Discussion / Park Updates
- 24-January 04
-
zodiac Offline
my solo is slowly edging along. i'm making progress in all areas, especially with planning, which i've really never done before. -
Ride6 Offline
I recently finished an area on a park that'll get released eventually.
Finishing up "a little something"; it's a design.
Brainstorming ideas for h2h.
Ride6 -
Six Frags Offline
-epws is around 40-50%
-other park at 30% (which is on-hold until I completed epws)
-H2H5 parks ?%
SF -
Louis! Offline
Project Tick Tock - 50%
Invador - 20%
IOA - 5%
Disney Far West - 1%
and a whole load of park planning for H2H -
robbie92 Offline
CF Solo-- 2-3%
DA-- 10%
Duo Design-- 5-10%
BGA v.2.0-- Planning Stages (not gonna be started until other full-scales are done or close to completion) -
Cocoa Offline
I've just got to finish the foliage for my rct2 design but I haven't played in a long time, so who knows when I will get around to it- the design is at about 95% finished.
My ll park is doing ok, I've still got to finish the sort of future-ish section which I've lost inspiration for. And merge some tracks, which is not as easy as it sounds on vista. Probably at 55%. I haven't played this since I stopped playing rct2 as well a month or so ago so I haven't made a lot of recent progress. -
Nokia Offline
sf duo-planning
solo-5%
anything else-on hold due to h2hEdited by Nokia, 28 March 2009 - 12:14 PM.
-
SSSammy Offline
im just hacking things together at the moment.
experimenting.
there is a water ride + coaster in the pipeline.
thast about 25.6 % done. -
J K Offline
*gasp*
whatever it is, it will be (hopefully) great
Yeah I was thinking that too. I was looking through MM last night and your two entries were awesome. I'd love to see a screen or two.
Tags
- No Tags