RCT Discussion / Park Updates

  • Richie%s's Photo
    A thing is being built by someone else in my solo which probably wont ever be finished even though i want to finish it. One area is at about 50% now, and entrance is about 5% done
  • Highball%s's Photo
    I've lost my drive to build again so DisneySea is dead in the water at 30%. Fear not, I will finish it.
  • egg_head%s's Photo
    The 'NewConcept' is about to reach the 25%...
    I want to build on it again. :)
  • CoasterForce%s's Photo
    Heaven - yay, more work is finally getting done, future area just needs a few more buildings, love the small touches I've added throughout, 90% due to additional details and such that need to be added. Topic updated - see sig.

    PT2 - probaly will never get completed, I've tried to get stuff done, I just have no drive and I'm struggling to get things started. A lot of concepts I had were too ambitious and just can't be finished with any type of time constraints whatsoever. I am usually not that type of person to bail out on this, but you never know, I guess.

    Edited by CoasterForce, 22 December 2005 - 09:15 PM.

  • Ride6%s's Photo
    Protour @ 35% and moving at a rate of 3-5% per day. I think I'll make it just in time. :)

    ride6
  • laz0rz%s's Photo
    Dream Big California is severely unfinished at the moment, I have like 6 areas and only two of them are done. So...about 20%.
  • Magnus%s's Photo

    Protour @ 35% and moving at a rate of 3-5% per day.  I think I'll make it just in time.  :)

    ride6

    View Post



    dito
  • Casimir%s's Photo
    Kanosos: 5%-10%
    I don't know exactly, but I'd say between this. I just started a new area. I'll finish the temple-ish thing when I think it's the right time^^
    Meanwhile, I build the new area, as you can see in the advertising district maybe tomorrew.
  • egg_head%s's Photo
    NewConcept is at a stage of... um.
    You shouldn't ask me. :p
  • J K%s's Photo
    Sikinos is at 80%, Just waiting for my guest spot to finish and send it back to me, but major work needs to be done on it, as its like my first solo and ive improved a bit. so i should really say about 70%

    Project Mystical my design is about 80%, a bit more archy and "atmosphere input" and i'll be happy.
  • ACEfanatic02%s's Photo
    Not that anyone cares, but:

    Visions VA 2006: 90%... still a bunch of foliage left.
    Design: 60%

    -ACE
  • tracidEdge%s's Photo
    i started a new park, lol. about 20%, at best.
  • RMM%s's Photo
    show sumthin
  • tracidEdge%s's Photo
    maybe later.
  • RMM%s's Photo
    prolly never finish it anyway...
  • hobbes%s's Photo
    Released:
    Meridian: Released, but with very few comments. The park is my second themed design, and features a floorless coaster with a hack on the station that I have never seen done before. I suggest checking it out, and all criticisms are appreciated if you do.

    In Progress:
    Carano Forest: 60%. Ironwood is finished, with details being added randomly. Svadilfari, the desert/atlantis area, is progressing very slowly still. A large castle type building is being constructed in the center of the area, but the inverted coaster has yet to be built, and there is still a wide area to theme.

    The Volcano: 80%. Most theming is complete, but it is a "bare essentials" type park. The coaster, Elgion, is mostly finished but I may try to re-work the ending sequence. Some minor buildings may be added. Comments have been that it is minimal, which is what I went for.

    Hess: 0%. Previously unnanounced, this is my latest project. Details as the design progresses (much later).
  • Brent%s's Photo

    prolly never finish it anyway...

    View Post


    Look who's talking.... :rolleyes:
  • Evil WME%s's Photo
    heey, blitz, how's anti?!
  • RMM%s's Photo

    Look who's talking.... :rolleyes:

    View Post


    Yea I know. I wasn't really sayin it like sarcastically or whatever. I agree wit you.
  • Metropole%s's Photo
    Fantasy Point-80/85%

Tags

  • No Tags

Members Reading