RCT Discussion / Park Updates
- 24-January 04
-
MCI Offline
Worked on SpreePark today. Made the Inverter "peep" friendly (the stats are okay now) and restructured the area path wise. Had to delete 50% of the supports for the coaster and restructure the queue, but that´s fine. So no real groundbreaking news on the park, but i am indeed still alive and working on it.
Before
After
-
Cocoa Offline
Im probably 33% or so on the disneysea LL park.
33% on a h2h88 sized park and maybe 15% on a h2h88 design
Id say when we left we were maybe 50% on our h28 finals park?
Ill try and mop stuff up before new year but may have to be a while before i seriously play again! -
G Force Offline
Forest Park Highlands (LL): 70%, hope to finish by the end of the year, not going to promise that though.
Southwinds: 50%, probably going to be close to a year or so before I can finish this, likely will need to wait till ORCT gets rid of the object limit. Still not happy with the planning in some of the park, so an area or two might be re-done.
The Dark Continent: 35%, sort of in limbo now, not sure if I want to continue on the current map and downsize the park, and re-start with a more up-to-date construction style (pallet, new objects etc...). Really no idea what I'm going to do with this currently, have built basically nothing on it since the early days of H2H.
Mystic Mill Design: 40%, probably could finish it up pretty quickly with mostly forest surroundings and a little expansion to the supporting area, might do this if I ever get a burst of inspiration to spend 20hr on trees.
Only other thing is a small classic woodie park/design I've done a few hours of work on, got another few ideas for it so we'll see if it turns into a design or a small park (most likely a small park). No real timeline on that.
-
Terry Inferno Offline
Raspberry Acres is chugging along. Two-thirds completed is an optimistic estimate, but it could see the light of day as early as mid-December.
This thing I'm building in Sedona likely won't be released for at least another year. This mess will be in the key of CS Mixolydian.
(not yet worthy of a giant screenshot)
-
csw Offline
definitely more than halfway on my LL park but I have hardly worked on it since the summer. Don't know when I'll start again but I will finish it some day.
-
Jappy Offline
The current list of Jappy projects:
Bumbly Beach: about 80-85% done, mostly outskirts to do and the last bits of park. Getting bored with building British terraces though... Hope to get this done by the end of the year, or early next year.
Ellison Lake (NCSO): just a fun little thing I do in downtime, so no hurry. Far from finished, I'd say 45%, but it's nice to work on something more simple next to all the high level detailed CSO stuff.
Mundos Magica: riiiiight.... RIP. The fate of this one will decided after BB is done, will probably be broken up into chunks to form different projects. I just don't feel any love for this park the way it is now. And that's essential if I want to stay motivated to work on a project.
-
Liampie Offline
boi it was at 95% a year and a half ago
2014 May 18: 20%
2016 April 11: 50%
2016 September 22: easily over 50%
2017 April 1: 95%
2017 May 13: 70%
2017 September 8: 75%
2018 October 22: 90%Do you notice anything?
-
csw Offline
2014 May 18: 20%
2016 April 11: 50%
2016 September 22: easily over 50%
2017 April 1: 95%
2017 May 13: 70%
2017 September 8: 75%
2018 October 22: 90%Do you notice anything?
how do I delete my account
-
Jappy Offline
Quick progress shot of BB: nearly done with the outkirts (remind me never to build another park with this much surroundings...), after that I can finish the park itself and to the finishing touches. A 2018 release is looking ever more likely.
-
RWE Offline
Those maps are all looking quite awesome! Hope to be able to show something myself soon.
-
bigshootergill Offline
Yeah, probably too big! After the handful of larger parks I did, I was planning on doing smaller projects. Anyway, it sat idle since H2H began, but now things are chugging along. Hopefully post a screen when I have enough of a completed section.
-
Liampie Offline
Made good progress on Seaquarium, but I had a small setback as I was running out of steam anyway... So I'm switching back to De Bedriegertjes. Seaquarium needs one more good push, but with only six weeks left in the year it may not happen in time. I'm confident I can finish at least one of them this year still, most likely De Bedriegertjes.
Tags
- No Tags