RCT Discussion / Park Updates
- 24-January 04
-
Louis! Offline
Have two parks I'm struggling with at the moment. One is flawed but I've had it forever an many say they enjoy the work (what's actually there), while the second, newer park is not as complete, but the technical skill level used is much higher and has more potential to me.
Both have the same concept with only slight differences, btw.
Now, which to continue on with?
Both! -
Dimi Offline
Solo 1: 30%
Solo 2: 20%
Micro: 10%
Glaubensuwilligkeit: 35%
Hard Rock Park Belgium: 75% or so -
robbie92 Offline
SFSF has gotten most of the tester feedback, so I will fix it up tonight, write a readme, and hopefully have it submitted soon. -
Louis! Offline
I think I know what parks you are on about. If one of them is the one I provided you with an awesomely compact coaster, then please complete that one, as it has the potential to be one of the greatest parks of that type, although there is a few parts there that would need slightly tweaking, but thats it, it's already to a fantastic standard and quite close to being completed. -
That Guy Offline
Universal Studios > SF over Texas > Gatorland (When I think of Gatorland I think of you, so apologies if you didn't make that)Have two parks I'm struggling with at the moment. One is flawed but I've had it forever an many say they enjoy the work (what's actually there), while the second, newer park is not as complete, but the technical skill level used is much higher and has more potential to me.
Both have the same concept with only slight differences, btw.
Now, which to continue on with? -
robbie92 Offline
Nin, I mentioned this on AIM, but I think you should continue the newer park as the older park is much too limiting. -
BelgianGuy Offline
I SAY FINISH SOMETHING, ANYTHING, I DON'T CARE!
you really need to learn to finish dude or I'll start ranting on aim/msn even more -
nin Offline
Yes, Louis that is the one. That Guy, you got it as well. Basically I feel as if my "get the park as compact as possible" days are drawing to a close, and I can't seem to figure this park out due to that. -
Louis! Offline
Well then complete the one I built the layout in then, that is the better one IMO, and easiest to finish. -
Cocoa Offline
nin, if you need any help with universal studios... you know where to find me. Right here!
anyway, there's nothing like a healthy break from rct to grow inspiration. aahhh, I think I'll pick up rct2 this time -
RamSam12 Offline
Today is the 2 year anniversary of me joining NE, so here is the current state of my projects. First off, I have decided to cancel the park for Horsetooth. The biggest problem with this is the huge map size, and I really do not know what I was thinking when I thought I could finish a park this size with the quality I want. Also I was dissatisfied with some of the layouts and how the park was turning out. Between a busy college schedule and life in general, I have just lost interest in finishing a park of this size. The project is not dead however, so I plan to restart it as a significantly smaller park sometime later on.
The good news is Elitch Gardens is progressing quite nicely. I would say it is about 40% complete right now. The actual workspace is about half the size of Horsetooth after the blacked out tiles. I have also been at the real park for the past few weekends for pre-season work, so I have tons of inspiration for this! -
Maverix Offline
Oak Point Creek: 90%, made a HUGE productivity boost and just built like a madman. Should be done by the end of May at the latest. -
robbie92 Offline
Lack of motivation/interest in the game for me atm, or lack of interest stemming from lack of inspiration. I'm gonna wrap up SFSF over the next few days and then take my summer break and hopefully come back in late August with a higher level of RCT work from now. -
Comet Offline
^It's kind of the opposite for me, I don't have the game all year long at school so I build up a lot of motivation for the summer. Anyway...
Nature's Fury- 30%
-progress has gone backwards
Tags
- No Tags