[ntamin22' timestamp='1564194056' post='755179']
I can't help but feel "Megalodon" is a little above the paygrade of usual Cedarfair naming. "Great White" or "Shark Bite" or "Hammerhead" or something on a 3rd-grade level is more their deal.
Haha sorry chemist. It really didn't take that long once I got the system down. Maybe 6-7hr to do the supports and stuff for the whole ride. Having done vortex already helped tho, kinda took a lot of stuff from that since it's basically the same ride.
Sick stuff, super clean aswell. I would be scared to ride this.
How about Leviathan?
What is it with you and the need to make coasters in rct that would be painful to ride IRL ^ ^
Looks impressive, obviously spent a lot of time on those supports and it payed off. Good job.
still waiting on G-Force to respond =p
Are you sure the flanges are correct?
It's a nice screen, but most of its appeal is of course entirely lost on me.