[ntamin22' timestamp='1564194056' post='755179']
I can't help but feel "Megalodon" is a little above the paygrade of usual Cedarfair naming. "Great White" or "Shark Bite" or "Hammerhead" or something on a 3rd-grade level is more their deal.
Haha sorry chemist. It really didn't take that long once I got the system down. Maybe 6-7hr to do the supports and stuff for the whole ride. Having done vortex already helped tho, kinda took a lot of stuff from that since it's basically the same ride.
25 Comments
phann Offline
Sick stuff, super clean aswell. I would be scared to ride this.
CoasterCreator9 Offline
How about Leviathan?
FredD Offline
What is it with you and the need to make coasters in rct that would be painful to ride IRL ^ ^
Looks impressive, obviously spent a lot of time on those supports and it payed off. Good job.
chemist Offline
still waiting on G-Force to respond =p
G Force Offline
posix Offline
Are you sure the flanges are correct?
It's a nice screen, but most of its appeal is of course entirely lost on me.